Water Treatment Plants
Camp Lejeune, NC – 8 MGD Reverse Osmosis Facility
Titus Engineering was awarded the contract to provide instrumentation and control system integration for a new 8-million-gallon-per-day reverse osmosis water treatment plant at Camp Lejeune, North Carolina.
Scope of services included:
Revising specifications and system design to comply with updated site cybersecurity policies aligned with NIST SP 800-82 (Guide to ICS Security)
Rebuilding the Nutanix OT environment and implementing STIG requirements
Specifying more than 400 control devices, including instrumentation
Designing, fabricating, and delivering six analyzer panels
Designing and fabricating four PLC control panels
Coordinating plant-wide control integration with three OEM PLC-controlled skid units
Integrating control systems for 42 wells, elevated tanks, and booster stations
Specifying and providing network infrastructure and control room equipment for total plant operation
This comprehensive integration ensured secure, reliable, and fully coordinated plant performance across all operational assets.
*Image from Easy-Peasy.AI